column
SAEP ALGORITHM OF SOLVING JOB SHOP SCHEDULING PROBLEM
WENG Miaofeng
1999, 28(2): 81-85.
RESEARCH ON TRUSTWORTHINESS AND TRUSTWORTHY ALGORITHM OF AI
LI Yingtan
1999, 28(2): 86-92,97.
THE STUDY OF STABILIZATION OF NONLINEAR CONSTANT INTERCONNECTED CONTROL SYSTEMS WITH TIME-DELAYS
DENG Zheming, ZHAND Xinzheng
1999, 28(2): 93-97.
GLOBAL STATE FEEDBACK H CONTROL FOR A CLASS OF NONSTANDARD SYSTEMS
QU Baida, HUANG Xiaoyuan
1999, 28(2): 98-102.
OPTIMIZATION OF MULTI-STAGE SERVE STATION SYSTEMS
ZHENG Yingwen
1999, 28(2): 103-106.
RESEARCH ON MODELLING VOICE NON-LINEAR DYNAMIC SYSTEMS
ZHENG Huiyong, XIAO Tianyuan, HAN Xiangli, LIU Huaqiang, DAI Guanzhong
1999, 28(2): 107-110.
ROBUST OPTIMAL DESIGN OF THE SYSTEM WITH L2 BOUNDED UNCERTAINTY UNDER REGIONAL POLE CONSTRAINT
FAN Yinghui, CHEN Shanben, ZHANG Fuen, CHAI Tianyou
1999, 28(2): 111-115,120.
IMAGE PREPROCESSING BASED ON SINGULAR VAILUE AND FACE RECOGNITION
JING Xiaoyuan, GUO Yaofei, YANG Jingyu
1999, 28(2): 116-120.
USING CONSTRAINT SATISFACTION ADAPTIVE NEURAL NETWORK AND EFFICENT HEURISITICS FOR JOB-SHOP SCHEDULING
YANG Shengxiamg, WANG Dingwei
1999, 28(2): 121-126.
THE SURVEY OF SCHEDULING OF BATCH CHEMICAL PROCESS
LI Huifang, LI Renhou, CHEN Haoxun
1999, 28(2): 127-135.
THE PROBLEM FOR PORTFOLIO INVESTMENT DECISION WITH FIXED TRANSACTION COSTS
LIU Hailong, SUN Liang, PAN Dehui
1999, 28(2): 136-140.
A HYBRID FLOWSHOP SCHEDULING PROBLEM WITH JIT TECHNICAL CONSTRAINTS:A CASE STUDY
PANG Hali, ZHENG Binglin, XU Xinhe
1999, 28(2): 141-145.
A NEW LEARNING CONTROLLER AND ITS APPLICATION TO PNEUMATIC SERVO SYSTEM
WANG Shulian, LU Lu, SHI Weixiang
1999, 28(2): 146-151.
ASYMPTOTIC TRACKING AND STATIC DECOUPLING BASED ON CONTROLLER PARAMETRIZATION
WANG Dejin
1999, 28(2): 157-160.