Abstract:
the conception of the scheduling &supervisory control integrated systems(SSCIS) is introduced in this paper on the basis of the analysis of scheduling problem and supervisory control problem respectively.-Production scheduling is the bottleneck to implement CIMS in process industry, while supervisory control of equipment and flow is the precondition of process scheduling. According to the construction and functions of the system, the framework of the system is given using the technique of multi-agent system in artificial intelligence. The contents studied are the design method of agent, the organization structure of the system, the coordination mechanism and so on.