李健, 贾元华, 敖谷昌. 冗余等待时间建模及匝道多目标协调控制[J]. 信息与控制, 2012, (2): 244-250,255. DOI: 10.3724/SP.J.1219.2012.00244
引用本文: 李健, 贾元华, 敖谷昌. 冗余等待时间建模及匝道多目标协调控制[J]. 信息与控制, 2012, (2): 244-250,255. DOI: 10.3724/SP.J.1219.2012.00244
LI Jian, JIA Yuanhua, AO Guchang. RedundancyWaiting Time Modelling and Multi-objective Ramp Coordinated Control[J]. INFORMATION AND CONTROL, 2012, (2): 244-250,255. DOI: 10.3724/SP.J.1219.2012.00244
Citation: LI Jian, JIA Yuanhua, AO Guchang. RedundancyWaiting Time Modelling and Multi-objective Ramp Coordinated Control[J]. INFORMATION AND CONTROL, 2012, (2): 244-250,255. DOI: 10.3724/SP.J.1219.2012.00244

冗余等待时间建模及匝道多目标协调控制

RedundancyWaiting Time Modelling and Multi-objective Ramp Coordinated Control

  • 摘要: 针对匝道等待时间描述中存在信息缺失的问题,结合排队论提出了一种新的冗余等待时间概念并建模分析.以此为基础,给出了匝道多目标协调控制方程,并以径向基为核函数设计了一种基于支持向量机的匝道控制律求解方法.利用高速公路联络线转向城市快速路的高峰时段实例数据进行仿真.实验结果表明,与其它控制方法相比,所提的模型和算法在描述匝道状态和规避冗余等待等方面的效果更优.

     

    Abstract: Aiming at solving the problem of information missing in ramp waiting time description, a novel concept ofredundancy waiting time is proposed and its model is analyzed combining queuing theory. On the basis, a function formulti-objective ramp coordinated control is presented, and a method for solving ramp control law based on the support vectormachine with radial basis kernel function is designed. The simulation based on in-situ data of tra c flow from freewayconnecting link turn to expressway in high-density period is performed. The experiment results show that comparing withother control methods, the proposed model and the algorithm are better in describing the state of the ramps and in reducingredundancy waiting time.

     

/

返回文章
返回