刘樵良. 用模糊集分析作业网络[J]. 信息与控制, 1983, 12(1): 25-27,18.
引用本文: 刘樵良. 用模糊集分析作业网络[J]. 信息与控制, 1983, 12(1): 25-27,18.
Liu Qiaoliang. Analysis of the Job Mix with Fuzzy Set[J]. INFORMATION AND CONTROL, 1983, 12(1): 25-27,18.
Citation: Liu Qiaoliang. Analysis of the Job Mix with Fuzzy Set[J]. INFORMATION AND CONTROL, 1983, 12(1): 25-27,18.

用模糊集分析作业网络

Analysis of the Job Mix with Fuzzy Set

  • 摘要: 在本文中用模糊数来考虑工程网络中作业时间的非肯定性,且介绍了一种以可能性分布表示的整个工程完工时间的方法.与PERT相比较,这里介绍的方法是合理的,简单的,且便于应用.

     

    Abstract: In this paper,fuzzy number is used to take the uncertainty in the job durationtime of the project network into consideration.And a procedure is proposed to calculate the completion time of the entire project in terms of the probability distribution.Compared with PERT,The method introduced is reasonable,simple andeasy to handle.

     

/

返回文章
返回