LI Lin-ying, HU Jing-tao. Scheduling Model of Complicated Cluster Tools with Single-Blade Robot[J]. INFORMATION AND CONTROL, 2009, 38(4): 431-436.
Citation: LI Lin-ying, HU Jing-tao. Scheduling Model of Complicated Cluster Tools with Single-Blade Robot[J]. INFORMATION AND CONTROL, 2009, 38(4): 431-436.

Scheduling Model of Complicated Cluster Tools with Single-Blade Robot

  • For the scheduling problem of complicated single-blade cluster tools with re-entrant and parallel chambers,the temporal constraints is derived by analyzing robot actions at the process chambers,robot,as well as parallel and re-entrant chambers,and a mixed integer programming model is built to get optimal sequence and minimal cycle time.The validity and efficiency of the proposed model is verified by the scheduling instances.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return