XU Changsheng, ZHOU Zhaoying, XIAO Pengdong, LIU Sixing. RESOURCE CONSTRAINED SCHEDULING BASED ON NEURAL NETWORK IN FMS[J]. INFORMATION AND CONTROL, 1995, 24(5): 305-311.
Citation: XU Changsheng, ZHOU Zhaoying, XIAO Pengdong, LIU Sixing. RESOURCE CONSTRAINED SCHEDULING BASED ON NEURAL NETWORK IN FMS[J]. INFORMATION AND CONTROL, 1995, 24(5): 305-311.

RESOURCE CONSTRAINED SCHEDULING BASED ON NEURAL NETWORK IN FMS

  • In this paper,a neural network method used to solve the resource constrained schedulingproblem in FMS is proposed. The resource constrained scheduling problem is first decomposed into a series ofmultidimensional knapsack models and an equivalent Hopfield network model for this representation is estab-lished. Then, by extending Hopfield network,an approach to solve the resource constrained scheduling problem is developed.This approach can avoid such common neural network difficulties as instability and localminima.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return