Citation: | YU Ping, LIU Sheng. STUDY OF FIN STABILIZER'S CONTROL SYSTEM BASED ON NEURAL NETWORK FOR NONLINEAR ROLL MOTION OF SHIP[J]. INFORMATION AND CONTROL, 2003, 32(3): 264-267. |
[1] |
刘胜,姚波.船舶减摇鳍系统最小方差控制仿真[J].信息与控制,1994,(3):1~6
|
[2] |
于萍,刘胜,等.减摇鳍升力反馈与鳍角反馈控制的对比[J].船舶工程,2001,(2):56~58
|
[3] |
Mistry S I, et al. Indirect control of a class of nonlinear dynanic systems[J]. IEEE Transactions on Neural Networks, 1996,7(4):1015~1023
|
[4] |
杨盐生,贾欣乐.船舶减摇鳍不确定非线性系统的变结构鲁棒控制[J].中国造船,1999(3):31~36
|
[5] |
Levin A V, et al. Control of nonlinear dynamical systems using neural networks-part Ⅱ:observability, identification and control [J]. IEEE Transactions on Neural Networks, 1996,7(1):30~42
|
[6] |
吴简彤,王建华.神经网络技术及其应用[M].哈尔滨:哈尔滨工程大学出版社,1998
|
[1] | GE Zhi-hao, XU Hao-jun. ANN Model for Pilot Based on Optimal Control and Simulation Analysis[J]. INFORMATION AND CONTROL, 2004, 33(6): 698-702. |
[2] | ZHAO Huai-ci, HUANG Sha-bai. MODELING AND SIMULATION OF COMPLEX SYSTEM BASED ON MULTI-AGENT[J]. INFORMATION AND CONTROL, 2003, 32(3): 198-203. |
[3] | XUAN Hui-yu, GAO Bao-jun, LI Qun, FENG Ping. A MULTI-AGENT ECONOMY SIMULATION MODEL BASED ON DISCRETE EVENTS SIMULATION[J]. INFORMATION AND CONTROL, 2002, 31(1): 84-88. |
[4] | LIN Hui-ping, FAN Yu-shun, WU Cheng. RESEARCH ON WORKFLOW SIMULATION TECHNOLOGY FOR BUSINESS PROCESS REENGINEERING[J]. INFORMATION AND CONTROL, 2001, 30(1): 11-15. |
[5] | XUAN Huiyu, WANG Lijuan. APPLICATION OF INVERSE SIMULATION IN QUEUING SYSTEM WITH UNCONTROLLABLE ARRIVING[J]. INFORMATION AND CONTROL, 1999, 28(4): 305-310. |
[6] | WU Jing, ZENG Jianchao, SUN Guoji. DYNAMIC SIMULATION METHODOLOGY OF INDUSTRIAL PROCESSES FOR OPERATOR TRAINING SIMULATOR[J]. INFORMATION AND CONTROL, 1997, 26(3): 221-226,233. |
[7] | BAI Fangzhou, CHEN Yuan, BAO Zhonggui. A QSIM-BASED GENERAL QUALITATIVE SIMULATION SYSTEM(GQSS)[J]. INFORMATION AND CONTROL, 1996, 25(1): 49-57. |
[8] | BAI Fangzhou, HUO Xin, BAO Zhonggui. QUALITATIVE REASONING FOR DYNAMIC SYSTEM:MODELING AND SIMULATION[J]. INFORMATION AND CONTROL, 1995, 24(4): 222-229. |
[9] | XIONG Guanleng, GAO Hong. SIMULATION ENVIRONMENT FOR RULE-BASED JOB SHOP SCHEDULING[J]. INFORMATION AND CONTROL, 1994, 23(4): 193-199. |
[10] | WANG Dingwei, XU Changguo. A SIMULATION STUDY ON PRODUCTION/INVENTORY CONTROL STRATEGIES[J]. INFORMATION AND CONTROL, 1994, 23(3): 154-159. |