LEI Fei, ZOU Yi-ren. A PID-based Real-time Control and Scheduling Co-design Approach[J]. INFORMATION AND CONTROL, 2004, 33(5): 541-544.
Citation: LEI Fei, ZOU Yi-ren. A PID-based Real-time Control and Scheduling Co-design Approach[J]. INFORMATION AND CONTROL, 2004, 33(5): 541-544.

A PID-based Real-time Control and Scheduling Co-design Approach

More Information
  • Received Date: March 07, 2004
  • Published Date: October 19, 2004
  • This paper presents a real-time control and scheduling codesign approach to compensate sampling jitter and sampling-actuation delays, which is caused by processor sharing. To some variable structure or hybrid systems, the task period is adjusted dynamically to adapt the change of its WCET (worst case execution time). The sampling jitter and delays, queried by the macro period case table, are compensated by the improved PID algorithm.
  • [1]
    Arzen K E,Cervin A,Eker J,et al.An introduction to control and scheduling co-design [A].Proceedings of the 39th IEEE Conference on Decision and Control [C].Piscataway,NJ,USA:IEEE,2000.4865~4870.
    [2]
    Astrom K J,Wittenmark B.Computer-Controlled Systems [M].New Jersey;Prentice Hall,1997.
    [3]
    Ryu R,Hong S.Toward automatic synthesis of schedulable realtime controllers [J].Integrated Computer-Aided Engineering,1998,5(3):261~277.
    [4]
    Seto D,Lehoczky J P,Sha L,et al.On task schedulability in real-time control systems [A].Proceedings of the 16th Real-time Systems Symposium [C].Los Alamitos,CA,USA;IEEE Computer Society,1996.13~21.
    [5]
    Kim B K.Task scheduling with feedback latency for real-time control systems [A].International Conference on Real-time Computing Systems and Applications [C].Los Alamitos,CA,USA:IEEE Computer Society,1998.37~41.
    [6]
    Buttazzo G C,Lipari G,Abeni L.Elastic task model for adaptive rate control [A].Proceedings of the 19th IEEE Real-time Systems Symposium [C].Los Alamitas,CA,USA;IEEE Computer Society,1998.286~295.
    [7]
    Cervin A,Eker J.Feedback scheduling of control tasks [A].Proceedings of the 39th IEEE Conference on Decision and Control [C].Piscataway,NJ,USA;IEEE,2000.4871~4876.
    [8]
    Stankovic J A,Lu C,Son S H,et al.The case for feedback control roal-time scheduling [A].Proceedings of the 11 th Euromicro Conference on Real-time Systems [C].Los Alamitos,CA.USA:IEEE Computer Society,1999.11~20.
    [9]
    Albertos P,Crespo A,Ripoll 1,et al.RT control scheduling to reduce control performance degrading [A].Proceedings of the 39th IEEE Conference on Decision and Control [C].Piscataway,NJ,USA;IEEE,2000.4889~4894.
    [10]
    Baruah S,Buttazzo G,Gorinsky S,et al.Scheduling periodic task systems to minimize output jitter [A].Proceedings of the 6th International Conference on Real-time Computing Systems and Applications [C].Los Alamitas,CA,USA;IEEE Computer Society,1999.62~69.
    [11]
    Rehbinder H,Sanfridson M.Integration of off-line scheduling and optimal control [A].Proceedings of the 12th Euromicro Conference on Real-time Systems [C].Los Alamitos,CA,USA:IEEE Computer Society,2000.137~143.
    [12]
    Marti P,Fuertes JM,Fohler G,et al.Jitter compensation for real-time control systems [A].Proceedings of the 22nd IEEE Realtime Systems Symposium [C].Los Alamitos,CA,USA;IEEE Computer Society,2001.39~48.
    [13]
    Ramamritham K.Allocation and scheduling of precedence-related periodic tasks [J].IEEE Transactions on Parallel and Distributed Systems,1995,6(4):412~420.
    [14]
    Natale M D,Stankovic J A.Scheduling distributed real-time tasks with minimum jitter [J].IEEE Transactions on Computers,2000,49(4):303~316.

Catalog

    Article views (800) PDF downloads (172) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return